Search results
- The new crossing will replace the George Massey Tunnel with a toll-free, eight-lane immersed tube tunnel that includes three general-purpose travel lanes and a dedicated public transit lane in each direction. The new tunnel will also feature a separate multi-use path to support walking, biking and other active transportation options.
news.gov.bc.ca/releases/2024MOTI0092-001159Team selected to design new toll-free, eight-lane Massey tunnel
People also ask
Will a new 8 lane tunnel replace the George Massey Tunnel?
Will the Fraser River Tunnel replace the George Massey Tunnel?
What will the new 8 lane tunnel include?
How many Lane is a new subway tunnel?
Should the Massey Tunnel be a bridge option?
Will the new George Massey Tunnel meet Surrey's needs in 2030?
Aug 18, 2021 · A new eight-lane immersed-tube tunnel will replace the George Massey Tunnel on Highway 99, providing people a toll-free crossing that aligns with regional interests and improves transit, cycling and walking connections across the Fraser River.
- Team selected to design new toll-free, eight-lane Massey tunnel
The new crossing will replace the George Massey Tunnel with...
- Massey Tunnel replacement procurement moves to next step
The new crossing will be an eight-lane immersed tube tunnel...
- Team selected to design new toll-free, eight-lane Massey tunnel
Jul 23, 2024 · The new crossing will replace the George Massey Tunnel with a toll-free, eight-lane immersed tube tunnel that includes three general-purpose travel lanes and a dedicated public transit lane in each direction.
Oct 18, 2023 · The new crossing will be an eight-lane immersed tube tunnel with three general-purpose travel lanes and a dedicated transit lane in each direction. The new tunnel will also feature a separate multi-use path to support pedestrians, cyclists and other active transportation options.
The Fraser River Tunnel Project includes a new, eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel on Highway 99. The new tunnel will have three vehicle lanes and a dedicated transit lane in each direction, with a separated active transportation corridor for cyclists and pedestrians.
- Ministry of Transportation and Infrastructure
- $4.15 billion
- TBD
- Transportation Investment Corporation
Aug 18, 2021 · An eight-lane tunnel under the Fraser River will replace an obsolete crossing that has been an increasing source of frustration for Metro Vancouver drivers.
Jul 23, 2024 · The Fraser River Tunnel Project includes a new, eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel on Highway 99. The new tunnel will have three vehicle lanes and a dedicated transit lane in each direction, with a separated active transportation corridor for cyclists and pedestrians.
The new toll-free eight-lane immersed tube tunnel will: Replace the existing George Massey Tunnel on Highway 99; Provide three vehicle lanes and a dedicated transit lane in each direction; Feature a separated multi-use pathway for cyclists and pedestrians that connects to active transportation routes on both sides of the Fraser River