      • Following the submission of S278/ S38 engineering details to Highway Development Management, the engineer will review the extent of the works to ensure compliance with the principles of the planning permission and that the adoptable extent is correct (in relation to new housing estate roads).
      www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/highways-development
  1. People also ask

  2. Sep 10, 2023 · Section 278 Agreements are a legal agreement between a developer and the Local Highway Authority (LHA) which allows the developer to make permanent alterations to the adopted highway as part of a valid planning permission. The Section 278 Agreements are outlined within the Highways Act 1980.

  3. s38 agreements relate to the maintenance of new highways by the highway authority and planning permission must be granted before they can be entered. The agreement will include details of the planning permission, technical drawings, programme of works and inspection.

  4. Work affecting the highway can only begin when some or all of the following items have happened: Section 278 (s278) agreement is signed by the developer and the local authority. The agreed design as per the planning permission. Details of any bond or surety required. Details of who will design and manage the works.

  5. The use of soakaways to drain adoptable highway may be acceptable, subject to satisfactory soakage tests, SUDS and other strict criteria. If after conclusion of the Agreement, it is found...

    • S38 Agreement Bond Sums
    • Bridges
    • Street Lighting

    From April 2024 Bond sums or security deposits for new housing estate road infrastructure will be based upon the following standard linear metre rates. 1. Carriageway (including adjacent footways): £2025.00 per linear metre 2. Cycleway: £510.00 per linear metre 3. Footpath: £405.00 per linear metre

    The assessment of structures within proposed highway will incur additional charges. To discuss your requirements please contact highways@cambridgeshire.gov.uk.

    Street lighting must comply to the latest specification as found in the council's Highways policies. Following the submission of S278/ S38 engineering details to Highway Development Management, the engineer will review the extent of the works to ensure compliance with the principles of the planning permission and that the adoptable extent is correc...

  6. Whether off-site or on-site, highway infrastructure is a critical component to the delivery of any proposed development. Section 278 agreements provide the legal mechanism required to carry out highway alterations on the existing network, whilst Section 38 agreements secure new road adoption by the highway authority.

  7. Work affecting the highway can only begin when both the following have happened: s278 agreement is signed by the developer and the council (with performance bond agreed) all pre-commencement...