  1. Description: The Garden State Parkway Bridge over the Passaic River, US Route 46, and River Drive is being widened to provide full-width lanes and adequate shoulders. This project is intended to extend the remaining life of the structure and improve safety. Schedule: Construction began in 2021 and is scheduled to be completed in 2026.

  2. Mar 25, 2022 · The following work is scheduled over the next FOURweeks: scgadmin. GSP ROADWAY AND INTERCHANGE 145 TOLL PLAZA. The Garden State Parkway implemented “One-Way Tolling” at Interchange 145. The northbound GSP exit toll at Interchange 145 has been eliminated and the entrance toll has increased.

  3. Aug 29, 2022 · Garden State Parkway Exit 105 Monthly Update: 08/29/22. The message below contains important project updates for the GSP Interchange 105 Improvement Project and will be posted on a monthly basis through the end of 2023. The next update will be posted in September, 2022.

  4. Oct 28, 2022 · The following work is scheduled over the next three weeks:

  5. Sep 27, 2022 · Parkway Bridge Superstructure Replacement, MP 106.3 to 106.5. The GSP Exit 105 project is now complete.

  6. This contract will also include deck repairs and resurfacing to six (6) bridges on the Garden State Parkway between Milepost 160.6 and 162.5. The work will be accomplished in stages while maintaining the flow of traffic by utilizing multiple lane shifts and a precast concrete construction barrier.

  7. People also ask

  8. Project Overview. The NJTA’s Parkway Bridge Deck and Superstructure Reconstruction Milepost 124.4 to 128.1 project involves work on six bridges, structure Nos. 124.4NO, No. 124.5SO, 124.5SI, 124.6NI, 128.0A and No. 128.0B.